Getting your Gulf office connected: fiber, internet lines and a secure link to the UK
How to get a new office in Dubai or Riyadh online on the day your team arrives: ordering business internet, in-building fiber, Wi-Fi, a backup line and a secure link back to UK head office.
- Order the business internet line as soon as you have a signed lease; it is usually the longest lead item.
- Always add a second, independent connection such as 5G so one fault doesn't stop the office.
- Link the office to UK head office with an encrypted SD-WAN or VPN, not by opening ports.
Start with the building
Before you sign a lease, ask which providers already have fiber into the building and where the building's comms room is. In the UAE the main providers are e& and du; in Saudi Arabia, stc, Mobily and Zain. A building already served by fiber can be connected far faster than one that needs new cabling from the street.
Inside the office, plan the structured cabling and fiber from the comms room to your rack, Wi-Fi access point positions and enough power for your network equipment. Fixing this after fit-out is expensive.
Order early and build in a backup
Business lines need a trade licence and company documents, so connectivity often waits on company setup. Order as soon as you can, and agree a temporary 5G connection for the first weeks if the fixed line is late.
Keep a second connection permanently, ideally from a different provider over a different path, with your firewall failing over automatically.
Connecting back to the UK
Most offices link to UK head office over an encrypted tunnel across the internet, managed by SD-WAN so traffic takes the best path. Larger estates may justify private international circuits. Either way, decide early where your systems will live: in the UK, in a UAE or Saudi cloud region, or both.
- Firewall with SD-WAN and automatic failover
- Separate networks for staff, guests and devices
- Single sign-on and multi-factor authentication from day one
- 24/7 monitoring of both internet lines
Questions
How long does a business internet line take in Dubai?
It depends on whether the building already has fiber from your chosen provider and on your company documents being ready. Order as soon as the lease is signed and plan a temporary 5G connection in case of delay.